Wednesday, November 4, 2009

APO SNP course content

Supply Network Planning Course :

1. Supply Network Planning: An Overview
Supply Chain Modeling
Supply Chain Planning

2. Master Data and Transaction Data in SNP
Working with Master Data
SCM Product Master
SCM Resource Master
The Production Data Structure
Scheduling in Supply Network Planning
Quota Arrangements and Source Determination in SNP
Transaction Data in Supply Network Planning

3. SNP Configuration
Planning Areas
Planning Books
Macros and Alerts
Navigation in the Planning Table

4. The Supply Network Planning Heuristic
SNP Heuristic Run
Capacity Check and Leveling
Planning Supplier Constraints using the SNP Heuristic
SNP Heuristic Scheduling
Aggregated Planning

5. SNP Run Using Capable to Match
Capable-to-Match Process
Descriptive Characteristics in CTM
Alternative Resources in CTM
Finite Supplier Planning in CTM

6. Optimization in Supply Network Planning
Supply Network Planning with the Optimizer
Optimizer Costs
Profiles Used by the Optimizer
Parameters of the Optimization Run
Comparing SNP Planning Methods

7. Safety Stock Planning
Safety Stock Planning in SNP

8. Deployment and the Transport Load Builder
Basics of Deployment
Deployment Run
Transport Load Builder

No comments: